Showing 1 - 10 of 26
Persistent link: https://www.econbiz.de/10000604995
Persistent link: https://www.econbiz.de/10000609707
Persistent link: https://www.econbiz.de/10000927617
Persistent link: https://www.econbiz.de/10000927620
Persistent link: https://www.econbiz.de/10000927637
Persistent link: https://www.econbiz.de/10000602604
Persistent link: https://www.econbiz.de/10000602605
This paper addresses methods for formulating and solving a general class of nonpreemptive resource-constrained project scheduling problems in which job durations are discrete functions of committed renewable, nonrenewable and doubly-constrained resources (multi-mode time resource tradeoff). We...
Persistent link: https://www.econbiz.de/10011745969
Two phases can be distinguished in academic course scheduling: In phase one lectures have to be assigned to professors, whereas in phase two the lectures have to be scheduled. Here we assume that the lectures are already assigned to professors, i.e. the first phase has been done. For the second...
Persistent link: https://www.econbiz.de/10011739457
We consider an extension of the classical resource-constrained project scheduling problem (RCPSP), which covers discrete resource-resource and time-resource tradeoffs. As a result a project scheduler is permitted to identify several alternatives or modes of accomplishment for each activity of...
Persistent link: https://www.econbiz.de/10011743239