Showing 1 - 10 of 23
In this study we compared seven commercial Software packages for project management. Employing multi attribute value theory, the comparison is based on a sound decision-theoretic framework. Additionally, we included a comprehensive assessment of the capability to solve resource-constrained...
Persistent link: https://www.econbiz.de/10011743541
This study assesses the quality of seven commercial project management packages to schedule precedence- and resource-constrained projects. We introduce the basic project scheduling model and give a short survey of optimal and heuristic Solution methods. Furthermore, we outline extensions of the...
Persistent link: https://www.econbiz.de/10011743636
We present a set of benchmark instances for the evaluation of Solution procedures for single- and multi-mode resource-constrained project scheduling problems. The instances have been systematically generated by the Standard project generator ProGen. They are characterized by the input-parameters...
Persistent link: https://www.econbiz.de/10011744376
This study assesses the quality of seven commercial project management systems to perform finite scheduling. We give a brief survey of the way commercial project management systems work and especially how they perform finite scheduling. Since the implemented methods are proprietary, we measure...
Persistent link: https://www.econbiz.de/10011744377
Persistent link: https://www.econbiz.de/10011787533
We consider the classical resource-constrained project scheduling problem (RCPSP). The paper gives a detailed algorithmic description and provides theoretical results on two widely known problem specific heuristics: The serial and the parallel scheduling scheme. An in-depth computational study...
Persistent link: https://www.econbiz.de/10011739559
We consider a generalization of the classical resource constrained project scheduling problem. We introduce so-called partially reiiewable resources by assuming for each resource a capacity on subsets of periods. The concept of partially renewable resources is a fundamental tool in order to make...
Persistent link: https://www.econbiz.de/10011808900
Persistent link: https://www.econbiz.de/10011735548
Since its advent, the 'just-in-time'-paradigm has considerable influence on production planning and control. While originally employed for high-volume production, 'just-in-time'-concepts are meanwhile documented for low-volume, make-to-order production as well. An example is the assembly of...
Persistent link: https://www.econbiz.de/10011736864
Die vorliegende Arbeit zeigt, welchen Beitrag die Koordinations- und Integrationsmechanismen des Projektmanagements zur effizienten Abwicklung von Projekten leisten können. Im Rahmen einer Taxonomie wird zwischen intrafunktionaler, interfunktionaler und interorganisationaler Koordination...
Persistent link: https://www.econbiz.de/10011737149