A bi-objective heuristic approach for green identical parallel machine scheduling
| Year of publication: |
2021
|
|---|---|
| Authors: | Anghinolfi, Davide ; Paolucci, Massimo ; Ronco, Roberto |
| Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 289.2021, 2 (1.3.), p. 416-434
|
| Subject: | Scheduling | Identical parallel machines | Bi-objective optimization heuristics | Makespan | Total energy consumption | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Theorie | Theory | Durchlaufzeit | Lead time | Algorithmus | Algorithm | Energiekonsum | Energy consumption |
-
Shop scheduling problems with pliable jobs
Knust, Sigrid, (2019)
-
Wang, Xiuli, (2015)
-
Belieres, Simon, (2023)
- More ...
-
A new three-step heuristic for the Master Bay Plan Problem
Ambrosino, Daniela, (2009)
-
Anghinolfi, Davide, (2009)
-
An optimization approach for the Train Load Planning Problem in seaport container terminals
Ambrosino, Daniela, (2021)
- More ...