A bi-objective re-entrant permutation flow shop scheduling problem : minimizing the makespan and maximum tardiness
Year of publication: |
2023
|
---|---|
Authors: | Fasihi, Maedeh ; Tavakkoli-Moghaddam, Reza ; Jolai, Fariborz |
Published in: |
Operational research : an international journal. - Berlin : Springer, ISSN 1866-1505, ZDB-ID 2425760-6. - Vol. 23.2023, 2, Art.-No. 29, p. 1-32
|
Subject: | Hybrid meta-heuristic | Lorenz dominance | Pareto dominance | Re-entrant permutation flow shop scheduling | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Evolutionärer Algorithmus | Evolutionary algorithm | Heuristik | Heuristics |
-
Minimizing energy consumption and makespan in a two-machine flowshop scheduling problem
Mansouri, S. Afshin, (2016)
-
Fernandez-Viagas, Victor, (2015)
-
Cell loading and family scheduling for jobs with individual due dates to minimise maximum tardiness
Süer, Grüsel A., (2014)
- More ...
-
Aziziankohan, Arvin, (2017)
-
Aziziankohan, Arvin, (2017)
-
Jolai, Fariborz, (2012)
- More ...