A Bi-Population Based Genetic Algorithm for the Resource-Constrained Project Scheduling Problem
Year of publication: |
2005-05-26
|
---|---|
Authors: | Debels, Dieter ; Vanhoucke, Mario |
Institutions: | Vlerick Business School |
Subject: | Networks | Topological structure | Graphs | Project Scheduling instances |
-
ON THE MORPHOLOGICAL STRUCTURE OF A NETWORK
VANHOUCKE, M., (2004)
-
Bertrand competition under network externalities
Aoyagi, Masaki, (2013)
-
Stable organizations with externalities
Currarini, Sergio, (2002)
- More ...
-
A hybrid scatter search / electromagnetism meta-heuristic for project scheduling
Debels, Dieter, (2003)
-
On the morphological structure of a network
Vanhoucke, Mario, (2005)
-
Optimal due date assignment in project scheduling.
Vanhoucke, Mario, (2002)
- More ...