A bottleneck-based heuristic for minimizing makespan in a flexible flow line with unrelated parallel machines
| Year of publication: |
2009
|
|---|---|
| Authors: | Chen, Chun-lung ; Chen, Chuen-lung |
| Published in: |
Computers & operations research : and their applications to problems of world concern ; an international journal. - Oxford [u.a.] : Elsevier, ISSN 0305-0548, ZDB-ID 194012-0. - Vol. 36.2009, 11, p. 3073-3081
|
| Subject: | Heuristik | Heuristics | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Fließfertigung | Assembly-line production | Produktionsplanung | Production planning | Durchlaufzeit | Lead time | Flexibles Fertigungssystem | Flexible manufacturing system |
-
Supply chain-oriented permutation flowshop scheduling considering flexible assembly and setup times
Ying, Kuo-Ching, (2023)
-
Zeng, Chuangfeng, (2025)
-
New scheduling rules for a dynamic flexible flow line problem with sequence-dependent setup times
Kia, Hamidreza, (2017)
- More ...
-
Chen, Chun-Lung, (2008)
-
Chen, Chun-Lung, (2009)
-
Chen, Chun-Lung, (2009)
- More ...