A combined robot selection and scheduling problem for flow-shops with no-wait restrictions
Year of publication: |
2014
|
---|---|
Authors: | Shabtay, Dvir ; Arviv, Kfir ; Stern, Helman ; Edan, Yael |
Published in: |
Omega. - Elsevier, ISSN 0305-0483. - Vol. 43.2014, C, p. 96-107
|
Publisher: |
Elsevier |
Subject: | Scheduling | Flow-shop | No-wait restriction | Robotic flow-shop | Makespan | Bicriteria shortest path problem |
-
A combined robot selection and scheduling problem for flow-shops with no-wait restrictions
Shabtay, Dvir, (2014)
-
TWO-MACHINE FLOW-SHOP MINIMUM-LENGTH SCHEDULING WITH INTERVAL PROCESSING TIMES
NG, C. T., (2009)
-
A note on batch scheduling on a two-machine flowshop with machine-dependent processing times
Mosheiov, Gur, (2023)
- More ...
-
A combined robot selection and scheduling problem for flow-shops with no-wait restrictions
Shabtay, Dvir, (2014)
-
Collaborative reinforcement learning for a two-robot job transfer flow-shop scheduling problem
Arviv, Kfir, (2016)
-
Advanced methods for displays and remote control of robots
Eliav, Ami, (2011)
- More ...