A continuous time model for multiple yard crane scheduling with last minute job arrivals
Year of publication: |
2012
|
---|---|
Authors: | Li, Wenkai ; Goh, Mark ; Wu, Yong ; Petering, M. E. H. ; Souza, R. de |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 136.2012, 2, p. 332-343
|
Subject: | Container yard operations | Continuous time | Scheduling | Rolling-horizon algorithm | Last minute jobs | Scheduling-Verfahren | Scheduling problem | Containerterminal | Container terminal | Kran | Crane | Algorithmus | Algorithm | Theorie | Theory |
-
Optimal algorithm for the general quay crane double-cycling problem
Lee, Chung-Yee, (2015)
-
Approximate the scheduling of quay cranes with non-crossing constraints
Zhang, An, (2017)
-
Optimal berth allocation and time-invariant quay crane assignment in container terminals
Türkoğullariı, Yavuz B., (2014)
- More ...
-
Discrete time model and algorithms for container yard crane scheduling
Li, Wenkai, (2009)
-
Petering, Matthew E. H., (2009)
-
Scheduling multiple yard cranes with crane interference and safety distance requirement
Wu, Yong, (2015)
- More ...