A cost minimisation model for joint production and maintenance planning under quality constraints
Year of publication: |
1-15 April 2017
|
---|---|
Authors: | Fakher, Hossein Beheshti ; Nourelfath, Mustapha ; Gendreau, Michel |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 55.2017, 7/8 (1/15.4.), p. 2163-2176
|
Subject: | capacitated lot-sizing | preventive maintenance | quality | inspection | imperfect process | Instandhaltung | Maintenance policy | Qualitätsmanagement | Quality management | Theorie | Theory | Losgröße | Lot size | Produktionssteuerung | Production control | Produktqualität | Product quality | Kuppelproduktion | Joint production | Produktionsplanung | Production planning |
-
Bouslah, Bassem, (2018)
-
Lot sizing in a deteriorating production system under inspections, imperfect maintenance and reworks
Chakraborty, T., (2014)
-
Bouslah, Bassem, (2014)
- More ...
-
An efficient heuristic for reliability design optimization problems
Ouzineb, Mohamed, (2010)
-
Ouzineb, Mohamed, (2011)
-
Ouzineb, Mohamed, (2011)
- More ...