A cutting and scheduling problem in float glass manufacturing
Year of publication: |
2014
|
---|---|
Authors: | Na, Byungsoo ; Ahmed, Shabbir ; Nemhauser, George L. ; Sokol, Joel |
Published in: |
Journal of scheduling. - New York, NY : Springer Science + Business Media LLC, ISSN 1094-6136, ZDB-ID 1492486-9. - Vol. 17.2014, 1, p. 95-107
|
Subject: | Cutting | Scheduling | Float line | Glass | Hybrid flow shop | Cyclic schedule | Scheduling-Verfahren | Scheduling problem | Glasindustrie | Glass industry | Produktionssteuerung | Production control | Durchlaufzeit | Lead time |
-
Optimization of automated float glass lines
Na, Byungsoo, (2013)
-
Rossi, Andrea, (2013)
-
On the two-stage hybrid flow shop with dedicated machines
Hadda, Hatem, (2015)
- More ...
-
Optimization of automated float glass lines
Na, Byungsoo, (2013)
-
Optimization of automated float glass lines
Na, Byungsoo, (2013)
-
Optimization of automated float glass lines
Na, Byungsoo, (2013)
- More ...