A fuzzy AHP and PROMETHEE method-based heuristic for disassembly line balancing problems
Year of publication: |
2014
|
---|---|
Authors: | Avikal, Shwetank ; Mishra, P. K. ; Jain, Rajeev |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 52.2014, 5 (1.3.), p. 1306-1317
|
Subject: | AHP | heuristic | design of disassembly | line balancing | product disassembly | PROMETHEE method | Heuristik | Heuristics | AHP-Verfahren | AHP approach | Fließfertigung | Assembly-line production | Multikriterielle Entscheidungsanalyse | Multi-criteria analysis | Fuzzy-Set-Theorie | Fuzzy sets |
-
Ziaei, Mohammad, (2016)
-
A comprehensive decision support model for the evaluation of eco-designs
Wang, K., (2014)
-
Optimal site selection for a hospital using a fuzzy extended ELECTRE approach
Kumar, Pravin, (2016)
- More ...
-
Prioritization of aesthetic attributes of car profile
Yadav, H.C., (2013)
-
A heuristic approach for U-shaped assembly line balancing to improve labor productivity
Avikal, Shwetank, (2013)
-
An integrated decision making approach for ERP system selection using SWARA and PROMETHEE method
Shukla, Sandarbh, (2016)
- More ...