A heuristic scheduling policy for multi-item, single-machine production systems with time-varying, stochastic demands
| Year of publication: |
1988
|
|---|---|
| Authors: | Leachman, Robert C. ; Gascon, André |
| Published in: |
Management science : journal of the Institute for Operations Research and the Management Sciences. - Catonsville, MD : INFORMS, ISSN 0025-1909, ZDB-ID 206345-1. - Vol. 34.1988, 3, p. 377-390
|
| Subject: | Produktionsplanung | Heuristik | Statistik | Stochastische | Prozesse | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Heuristics | Produktionssystem | Manufacturing system | Stochastischer Prozess | Stochastic process |
-
Lot-sizing in a multi-stage flow line production system with energy consideration
Masmoudi, Oussama, (2017)
-
Battaïa, Olga, (2023)
-
Zhang, Zhe, (2024)
- More ...
-
A dynamic programming solution to the dynamic, multi-item, single-machine scheduling problem
Gascon, André, (1988)
-
Leachman, Robert C., (1991)
-
Gonçalves, José F., (1994)
- More ...