A hybrid finite production rate system featuring random breakdown and rework
Year of publication: |
2020
|
---|---|
Authors: | Chiu, Singa Wang ; Chen, Hui-Cun ; Wu, Hua-Yao ; Chiu, Yuan-Shyi Peter |
Published in: |
Operations Research Perspectives. - Amsterdam : Elsevier, ISSN 2214-7160. - Vol. 7.2020, p. 1-10
|
Publisher: |
Amsterdam : Elsevier |
Subject: | Hybrid inventory system | Finite production rate | Rework | Random breakdown | Partial outsourcing | Production management |
-
A hybrid finite production rate system featuring random breakdown and rework
Chiu, Singa Wang, (2020)
-
Chand, Suresh, (2018)
-
Sisodia, Vikas, (2023)
- More ...
-
A hybrid finite production rate system featuring random breakdown and rework
Chiu, Singa Wang, (2020)
-
Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
Chiu, Singa Wang, (2007)
-
Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
Chiu, Singa Wang, (2007)
- More ...