A meta-heuristic for design of a capacitated production/inventory system
Year of publication: |
2010
|
---|---|
Authors: | Gurgur, Cigdem Z. |
Published in: |
International Journal of Services, Economics and Management. - Inderscience Enterprises Ltd, ISSN 1753-0822. - Vol. 2.2010, 3/4, p. 412-432
|
Publisher: |
Inderscience Enterprises Ltd |
Subject: | capacity planning | inventory management | multi-item | multi-echelon | multi-stage | decentralised production-inventory systems | pull type | numerical optimisation | stochastic modelling | metaheuristics | total inventory cost | service-level constraints | response surface methodology | RSM | metamodelling | capacitated production-inventory system |
-
Aviv, Yossi, (2001)
-
Expediting in two-echelon spare parts inventory systems
Drent, Melvin, (2021)
-
Investigating estimation error reduction strategies in complex engineering systems
Goethals, Paul, (2014)
- More ...
-
A meta-heuristic for design of a capacitated production/inventory system
Gurgur, Cigdem Z., (2010)
-
Optimisation of warranty reserve policies
Gurgur, Cigdem Z., (2011)
-
Mid-cycle capital planning optimization
Gurgur, Cigdem Z., (2009)
- More ...