A methodology for the large-scale multi-period precedence-constrained knapsack problem : an application in the mining industry
Year of publication: |
November 2017
|
---|---|
Authors: | Samavati, Mehran ; Essam, Daryl ; Nehring, Micah ; Sarker, Ruhul |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 193.2017, p. 12-20
|
Subject: | Integer programming | Multi-period precedence-constrained knapsack | Open pit mine scheduling | Topological ordering | Bergbau | Mining | Ganzzahlige Optimierung | Theorie | Theory | Scheduling-Verfahren | Scheduling problem | Operations Research | Operations research |
-
Production scheduling for strategic open pit mine planning : a mixed-integer programming approach
Rivera Letelier, Orlando, (2020)
-
Nancel-Penard, Pierre, (2022)
-
Optimizing the cutoff grade for an operational underground mine
King, Barry, (2018)
- More ...
-
A new methodology for the open-pit mine production scheduling problem
Samavati, Mehran, (2018)
-
A local branching heuristic for the open pit mine production scheduling problem
Samavati, Mehran, (2017)
-
Production planning and scheduling in mining scenarios under IPCC mining systems
Samavati, Mehran, (2020)
- More ...