A new bi-level meta-heuristic approach for a single machine JIT-scheduling in the batch delivery system with controllable due dates
Year of publication: |
2016
|
---|---|
Authors: | Abedi, Mehdi ; Seidgar, Hany |
Published in: |
International journal of services and operations management. - Olney : Inderscience, ISSN 1744-2370, ZDB-ID 2186492-5. - Vol. 23.2016, 2, p. 135-152
|
Subject: | single machine scheduling problem | batch delivery system | due date assigment | meta-heuristic algorithms | Taguchi method | Scheduling-Verfahren | Scheduling problem | Algorithmus | Algorithm | Theorie | Theory | Produktionssteuerung | Production control | Durchlaufzeit | Lead time | Heuristik | Heuristics |
-
Rostami, Mohammad, (2020)
-
An efficient iterated local search algorithm for the total tardiness blocking flow shop problem
Ribas, Imma, (2013)
-
Ozturk, Onur, (2012)
- More ...
-
Hybrid scheduling and maintenance problem using artificial neural network based meta-heuristics
Abedi, Mehdi, (2017)
-
Seidgar, Hany, (2014)
-
Seidgar, Hany, (2015)
- More ...