A new repair model and its optimization for cold standby system
Year of publication: |
2022
|
---|---|
Authors: | Wang, Junyuan ; Ye, Jimin |
Subject: | Average cost rate | Cold standby system | Generalized Polya Process | Geometric process | Optimization |
-
Optimal repair–replacement policies for a system with two types of failures
Wang, Guan Jun, (2013)
-
Optimal Replacement Policy Based on the Number of Down Times
Hanagal, David D., (2010)
-
Optimal replacement policy based on maximum repair time for a random shock and wear model
Yu, Miaomiao, (2017)
- More ...
-
Wang, Junyuan, (2003)
-
The Mean Squared Error of Small Area Predictors Constructed With Estimated Area Variances
Wang, Junyuan, (2003)
-
The mean squared error of small area predictors constructed with estimated area variances
Wang, Junyuan, (2003)
- More ...