A note on "simultaneously scheduling n jobs and preventive maintenance on the two-machine flow shop to minimize the makespan"
Year of publication: |
2015
|
---|---|
Authors: | Hadda, Hatem |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 159.2015, p. 221-222
|
Subject: | Scheduling | Flow shop | Preventive maintenance | Availability constraint | Makespan | Durchlaufzeit | Lead time | Scheduling-Verfahren | Scheduling problem | Instandhaltung | Maintenance policy | Algorithmus | Algorithm | Theorie | Theory | Heuristik | Heuristics | Produktionssteuerung | Production control |
-
Two-machine flow shop and open shop scheduling problems with a single maintenance window
Mosheiov, Gur, (2018)
-
Nouri, Behdin Vehedi, (2013)
-
Minimizing the makespan on a single machine with flexible maintenances and jobs' release dates
Cui, Wei-wei, (2017)
- More ...
-
Hadda, Hatem, (2015)
-
A note on “A heuristic method for two-stage hybrid flow shop with dedicated machines”
Hadda, Hatem, (2013)
-
On the two-stage assembly flow shop problem
Hadda, Hatem, (2024)
- More ...