A note on "simultaneously scheduling n jobs and preventive maintenance on the two-machine flow shop to minimize the makespan"
| Year of publication: |
2015
|
|---|---|
| Authors: | Hadda, Hatem |
| Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 159.2015, p. 221-222
|
| Subject: | Scheduling | Flow shop | Preventive maintenance | Availability constraint | Makespan | Durchlaufzeit | Lead time | Scheduling-Verfahren | Scheduling problem | Instandhaltung | Maintenance policy | Algorithmus | Algorithm | Theorie | Theory | Heuristik | Heuristics | Produktionssteuerung | Production control |
-
Two-machine flow shop and open shop scheduling problems with a single maintenance window
Mosheiov, Gur, (2018)
-
Fei, Aiyue, (2025)
-
Nouri, Behdin Vehedi, (2013)
- More ...
-
An improved algorithm for the two machine flow shop problem with several availability contraints
Hadda, Hatem, (2010)
-
Hadda, Hatem, (2009)
-
Approximation results for the two-machine job shop under limited machine availability
Hadda, Hatem, (2017)
- More ...