A novel imperialist competitive algorithm for bi-criteria scheduling of the assembly flowshop problem
| Year of publication: |
2011
|
|---|---|
| Authors: | Shokrollahpour, E. ; Zandieh, M. ; Dorri, Behrouz |
| Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 49.2011, 10/11 (15/1.5/6.), p. 3087-3103
|
| Subject: | Imperialist competitive algorithm | Fließfertigung | Assembly-line production | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Heuristik | Heuristics | Algorithmus | Algorithm | Experiment |
-
Navaei, Javad, (2014)
-
Rabiee, M., (2012)
-
Henke, Thomas, (2022)
- More ...
-
Shokrollahpour, E., (2011)
-
Torabandeh, Mohammad Ali, (2023)
-
Assembly line balancing by a new multi-objective differential evolution algorithm based on TOPSIS
Nourmohammadi, A., (2011)
- More ...