A parallel machine lot-sizing and scheduling problem with a secondary resource and cumulative demand
| Year of publication: |
1-15 May 2018
|
|---|---|
| Authors: | Güngör, Murat ; Ünal, Ali Tamer ; Taşkın, Z. Caner |
| Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 56.2018, 9 (1/15.5.), p. 3344-3357
|
| Subject: | lot-sizing | scheduling | parallel machines | mixed integer linear programming | secondary resource | cumulative demand | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Losgröße | Lot size | Produktionsplanung | Production planning | Ganzzahlige Optimierung | Integer programming | Produktionssteuerung | Production control |
-
Larroche, François, (2022)
-
Single-machine capacitated lot-sizing and scheduling with delivery dates and quantities
Boctor, Fayez F., (2022)
-
Minimizing setups and waste when printing labels of consumer goods
Meyr, Herbert, (2021)
- More ...
-
A note on the shifting bottleneck procedure for job shop scheduling
Güngör, Murat, (2023)
-
Güngör, Murat, (2025)
-
Elhüseyni, Murat, (2021)
- More ...