A path relinking with tabu search algorithm for solving hybrid flow shop scheduling problem considering multiple critical paths
| Year of publication: |
2024
|
|---|---|
| Authors: | Zhou, Hao ; Liu, Hui ; Lv, Chang ; Zhang, Chaoyong ; Shen, Weiming |
| Published in: |
Computers & operations research : an international journal. - Amsterdam [u.a.] : Elsevier, ISSN 0305-0548, ZDB-ID 1499736-8. - Vol. 170.2024, Art.-No. 106783, p. 1-13
|
| Subject: | Hybrid flow shop scheduling | Path relinking | Tabu search | Neighborhood structure | Multiple critical paths | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Durchlaufzeit | Lead time | Algorithmus | Algorithm | Evolutionärer Algorithmus | Evolutionary algorithm | Theorie | Theory |
-
Sun, Jinghe, (2021)
-
Bi-objective hybrid flow shop scheduling with common due date
Li, Zhi, (2021)
-
Zhang, Zi-Qi, (2026)
- More ...
-
Lv, Chang, (2024)
-
Lv, Chang, (2023)
-
A fuzzy correlation based heuristic for dual-mode integrated location routing problem
Lv, Chang, (2022)
- More ...