A review of methods and algorithms for optimizing construction scheduling
| Year of publication: |
2013
|
|---|---|
| Authors: | Zhou, J. ; Love, Peter ; Wang, X. ; Teo, Kok Lay ; Irani, Zahir |
| Published in: |
Journal of the Operational Research Society : OR. - Basingstoke, Hampshire : Palgrave, ISSN 0160-5682, ZDB-ID 716033-1. - Vol. 64.2013, 8, p. 1091-1105
|
| Subject: | algorithm | construction | optimization | scheduling | Scheduling-Verfahren | Scheduling problem | Algorithmus | Algorithm | Theorie | Theory | Mathematische Optimierung | Mathematical programming |
-
A stochastic tabu search algorithm to align physician schedule with patient flow
Niroumandrad, Nazgol, (2018)
-
Éles, András, (2025)
-
Çetinkaya, İbrahim Oğuz, (2026)
- More ...
-
An exact penalty function method for optimising QAP formulation in facility layout problem
Zhou, Jingyang, (2017)
-
Multi-period portfolio optimization under probabilistic risk measure
Sun, Yufei, (2016)
-
Dynamic variational inequality in fuzzy environments
Wang, Xing, (2020)
- More ...