A sampling-based approach for managing lot release in time constraint tunnels in semiconductor manufacturing
| Year of publication: |
2021
|
|---|---|
| Authors: | Lima, Alexandre ; Borodin, Valeria ; Dauzère-Péres, Stéphane ; Vialletelle, Philippe |
| Published in: |
International journal of production research. - London [u.a.] : Taylor & Francis, ISSN 1366-588X, ZDB-ID 1485085-0. - Vol. 59.2021, 3, p. 860-884
|
| Subject: | probability estimation | semiconductor manufacturing | sequential sampling-based approach | time constraints | Halbleiterindustrie | Semiconductor industry | Theorie | Theory | Halbleiter | Semiconductor | Scheduling-Verfahren | Scheduling problem | Simulation |
-
Ghaedy-Heidary, Ensieh, (2024)
-
Scenario-based multi-objective robust scheduling for a semiconductor production line
Liu, Juan, (2019)
-
Chang, Xiaokun, (2017)
- More ...
-
Optimizing multiple qualifications of products on non-identical parallel machines
Perraudat, Antoine, (2022)
-
Integrated planning of maintenance operations and workload allocation
Rodoplu, Melek, (2023)
-
Robust tactical qualification decisions in flexible manufacturing systems
Perraudat, Antoine, (2022)
- More ...