A two-stage flexible flow shop problem with unit-execution-time jobs and batching
Year of publication: |
2014
|
---|---|
Authors: | Gerstl, Enrique ; Mosheiov, Gur |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 158.2014, p. 171-178
|
Subject: | Deterministic scheduling | Flexible flowshop | Makespan | Batch scheduling | Scheduling-Verfahren | Scheduling problem | Produktionssteuerung | Production control | Durchlaufzeit | Lead time | Theorie | Theory | Flexibles Fertigungssystem | Flexible manufacturing system | Evolutionärer Algorithmus | Evolutionary algorithm | Losgröße | Lot size | Heuristik | Heuristics | Produktionsplanung | Production planning |
-
Multi-objective optimization of integrated lot-sizing and scheduling problem in flexible job shops
Rohaninejad, Mohammad, (2016)
-
Defersha, Fantahun M., (2012)
-
Matin, Hossein N. Z., (2017)
- More ...
-
A two-stage flow shop batch-scheduling problem with the option of using Not-All-Machines
Gerstl, Enrique, (2013)
-
A two-stage flexible flow shop problem with unit-execution-time jobs and batching
Gerstl, Enrique, (2014)
-
Due-window assignment with identical jobs on parallel uniform machines
Gerstl, Enrique, (2013)
- More ...