A two-stage flow shop batch-scheduling problem with the option of using Not-All-Machines
Year of publication: |
2013
|
---|---|
Authors: | Gerstl, Enrique ; Mosheiov, Gur |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 146.2013, 1, p. 161-166
|
Subject: | Scheduling | Flowshop | Makespan | Dynamic programming | Heuristic | Not-All-Machines | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Durchlaufzeit | Lead time | Dynamische Optimierung | Theorie | Theory | Algorithmus | Algorithm | Mathematische Optimierung | Mathematical programming |
-
Krishnaraj, J., (2012)
-
Scheduling blocking flowshops with setup times via constraint guided and accelerated local search
Newton, M. A. Hakim, (2019)
-
Sharma, Meenakshi, (2022)
- More ...
-
A two-stage flow shop batch-scheduling problem with the option of using Not-All-Machines
Gerstl, Enrique, (2013)
-
A two-stage flexible flow shop problem with unit-execution-time jobs and batching
Gerstl, Enrique, (2014)
-
Due-window assignment with identical jobs on parallel uniform machines
Gerstl, Enrique, (2013)
- More ...