A unified work breakdown structure-based framework for building asset management
| Year of publication: |
2020
|
|---|---|
| Authors: | Al-Kasasbeh, Maha ; Abudayyeh, Osama ; Liu, Hexu |
| Published in: |
Journal of Facilities Management. - Emerald Publishing Limited, ISSN 1472-5967, ZDB-ID 2119497-X. - Vol. 18.2020, 4, p. 437-450
|
| Publisher: |
Emerald Publishing Limited |
| Subject: | Asset management | Building inventory | Classification system | Work breakdown structure (WBS) |
-
An optimization method for selecting project risk response strategies
Zhang, Yao, (2014)
-
A Classification System for Economic Stochastic Control Models
Kendrick, David, (2006)
-
What's your real age? : an empirical analysis of identity fraud in online game
Ahn, Daehwan, (2018)
- More ...
-
ICT-based integrated framework for smart facility management: an industry perspective
Sulaiman, Mohammed, (2021)
-
An investigation of management’s commitment to construction safety
Abudayyeh, Osama, (2006)
-
Using Non-Destructive technologies and methods in Bridge management systems
Abudayyeh, Osama, (2004)
- More ...