ABC-based manufacturing scheduling for unrelated parallel machines with machine-dependent and job sequence-dependent setup times
| Year of publication: |
2014
|
|---|---|
| Authors: | Lin, Shih Wei ; Ying, Kuo-ching |
| Published in: |
Computers & operations research : and their applications to problems of world concern ; an international journal. - Oxford [u.a.] : Elsevier, ISSN 0305-0548, ZDB-ID 194012-0. - Vol. 51.2014, p. 172-181
|
| Subject: | Scheduling | Unrelated parallel machines | Setup times | Artificial bee colony | Metaheuristics | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Durchlaufzeit | Lead time | Theorie | Theory | Evolutionärer Algorithmus | Evolutionary algorithm | Algorithmus | Algorithm |
-
Total completion time with markespan constraint in no-wait flowshops with setup times
Allahverdi, Ali, (2014)
-
Morais, Rafael, (2024)
-
Minimising makespan in distributed mixed no-idle flowshops
Cheng, Chen-Yang, (2019)
- More ...
-
Minimising makespan in distributed assembly hybrid flowshop scheduling problems
Ying, Kuo-Ching, (2025)
-
Minimising makespan in job-shops with deterministic machine availability constraints
Lin, Shih Wei, (2021)
-
Meto-heuristic algorithms for wafer sorting scheduling problems
Lin, Shih Wei, (2011)
- More ...