Accelerating cleanup: Paths to closure
This report describes the status of Environmental Management`s (EM`s) cleanup program and a direction forward to complete achievement of the 2006 vision. Achieving the 2006 vision results in significant benefits related to accomplishing EM program objectives. As DOE sites accelerate cleanup activities, risks to public health, the environment, and worker safety and health are all reduced. Finding more efficient ways to conduct work can result in making compliance with applicable environmental requirements easier to achieve. Finally, as cleanup activities at sites are completed, the EM program can focus attention and resources on the small number of sites with more complex cleanup challenges. Chapter 1 describes the process by which this report has been developed and what it hopes to accomplish, its relationship to the EM decision-making process, and a general background of the EM mission and program. Chapter 2 describes how the site-by-site projections were constructed, and summarizes, for each of DOE`s 11 Operations/Field Offices, the projected costs and schedules for completing the cleanup mission. Chapter 3 presents summaries of the detailed cleanup projections from three of the 11 Operations/Field Offices: Rocky Flats (Colorado), Richland (Washington), and Savannah River (South Carolina). The remaining eight Operations/Field Office summaries are in Appendix E. Chapter 4 reviews the cost drivers, budgetary constraints, and performance enhancements underlying the detailed analysis of the 353 projects that comprise EM`s accelerated cleanup and closure effort. Chapter 5 describes a management system to support the EM program. Chapter 6 provides responses to the general comments received on the February draft of this document.
Year of publication: |
2009-12-10
|
---|---|
Subject: | nuclear fuels | REMEDIAL ACTION | WASTE MANAGEMENT | NUMERICAL DATA | US DOE | SITE CHARACTERIZATION | HAZARDOUS MATERIALS | RADIOACTIVE WASTES |
Saved in:
freely available
Saved in favorites
Similar items by subject
-
Monitoring plan for borehole logging at 216-Z-1A Tile Field, 216-Z-9 Trench, and 216-Z-12 Crib
Horton, D.G., (2009)
-
Risk reduction and the privatization option: First principles
Bjornstad, D.J., (2009)
-
(2009)
- More ...