An algorithm for project (job) sequencing with resource constraints
| Year of publication: |
1972
|
|---|---|
| Authors: | Gorenstein, Samuel |
| Published in: |
Operations research. - Catonsville, MD : INFORMS, ISSN 0030-364X, ZDB-ID 123389-0. - Vol. 20.1972, 4, p. 835-850
|
| Subject: | Projektplanung | Algorithmus | Algorithm | Projektmanagement | Project management | Theorie | Theory | Scheduling-Verfahren | Scheduling problem | Produktionssteuerung | Production control |
-
Single-machine scheduling of multiple projects with controllable processing times
Geng, Zhichao, (2023)
-
Schnell, Alexander, (2017)
-
Scheduling two projects with controllable processing times in a single-machine environment
Choi, Byung-Cheon, (2020)
- More ...
-
Gorenstein, Samuel, (1970)
-
Printing press scheduling for multi-edition periodicals
Gorenstein, Samuel, (1970)
-
Some contributions to inventory and production planning models
Gorenstein, Samuel, (1968)
- More ...