An effective neighborhood search for scheduling in dual-resource constrained interval job shop with environmental objective
| Year of publication: |
2015
|
|---|---|
| Authors: | Lei, Deming ; Guo, XiuPing |
| Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 159.2015, p. 296-303
|
| Subject: | Dynamical neighborhood search | Dual-resource constrained job shop | Scheduling | Interval carbon footprint | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Treibhausgas-Emissionen | Greenhouse gas emissions | Nachbarschaft | Neighbourhood | Produktionssteuerung | Production control |
-
Liu, Zhifeng, (2021)
-
A new neighbourhood structure for job shop scheduling problems
Xie, Jin, (2023)
-
Split-merge : using exponential neighborhood search for scheduling a batching machine
Cabo, Marta, (2015)
- More ...
-
A shuffled frog-leaping algorithm for job shop scheduling with outsourcing options
Lei, Deming, (2016)
-
Variable neighborhood search for the second type of two-sided assembly line balancing problem
Lei, Deming, (2016)
-
Lei, Deming, (2017)
- More ...