An integrated programming model for storage management and vehicle scheduling at container terminals
Year of publication: |
2013
|
---|---|
Authors: | Wu, Yue ; Luo, Jiabin ; Zhang, Dali ; Dong, Ming |
Published in: |
Research in Transportation Economics. - Elsevier, ISSN 0739-8859. - Vol. 42.2013, 1, p. 13-27
|
Publisher: |
Elsevier |
Subject: | Integrated scheduling | Container port terminal | Mixed integer programming | Genetic algorithm |
-
Integrated scheduling of production and delivery with time windows
Low, Chinyao, (2013)
-
Pratap, Saurabh, (2016)
-
Integrated production and distribution scheduling with a perishable product
Devapriya, Priyantha, (2017)
- More ...
-
Luo, Jiabin, (2015)
-
Zhu, Lin, (2023)
-
A two stage stochastic equilibrium model for electricity markets with two way contracts
Zhang, Dali, (2010)
- More ...