An investigation on a two-agent single-machine scheduling problem with unequal release dates
| Year of publication: |
2012
|
|---|---|
| Authors: | Yin, Yunqiang ; Wu, Wen-hsiang ; Cheng, Sheunn-ren ; Wu, Chin-chia |
| Published in: |
Computers & operations research : and their applications to problems of world concern ; an international journal. - Oxford [u.a.] : Elsevier, ISSN 0305-0548, ZDB-ID 194012-0. - Vol. 39.2012, 12, p. 3062-3073
|
| Subject: | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Produktionssteuerung | Production control | Branch-and-Bound | Branch and Bound |
-
Soler, Willy A. O., (2021)
-
Scheduling piecewise linear deteriorating jobs to minimize makespan in a two-machine flowshop
Jafari-Nodoushan, Abbasali, (2021)
-
On the two-stage assembly flow shop problem
Hadda, Hatem, (2024)
- More ...
-
Wu, Chin-chia, (2012)
-
The single-machine total weighted tardiness scheduling problem with position-based learning effects
Yin, Yunqiang, (2012)
-
A tabu method for two-agent single-machinescheduling with deterioration jobs
Wu, Wen-hsiang, (2013)
- More ...