A batch scheduling model on unrelated parallel machines with resource constraints and sequence-dependent setup time to minimize total actual flow time
| Year of publication: |
2026
|
|---|---|
| Authors: | Yusriski, Rinto ; Nasution, Andri Rachmat Kumalasian ; Isnaini, Mohammad Mi'radj ; Halim, Abdul Hakim |
| Published in: |
Journal of industrial engineering and management : JIEM. - Terrassa : Universitat Politècnica de Catalunya (UPC), ISSN 2013-0953, ZDB-ID 2495074-9. - Vol. 19.2026, 1, p. 58-81
|
| Subject: | Batch scheduling | Resource constraints | Sequence-dependent setup | Total actual flow time | Unrelated parallel machine | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Theorie | Theory | Produktionssteuerung | Production control | Heuristik | Heuristics |
-
Ozturk, Onur, (2012)
-
Ozturk, Onur, (2017)
-
Minimising makespan on a batch processing machine using heuristics improved by an enumeration scheme
Li, XiaoLin, (2017)
- More ...
-
Kurniawan, Dwi, (2024)
-
Suryadhini, Pratya Poeri, (2021)
-
Kurniawan, Dwi, (2020)
- More ...