Bi-criteria scheduling of a flowshop manufacturing cell with sequence dependent setup times
Year of publication: |
2007
|
---|---|
Authors: | Hendizadeh, S. Hamed ; ElMekkawy, Tarek Y. ; Wang, G. Gary |
Published in: |
European Journal of Industrial Engineering. - Inderscience Enterprises Ltd, ISSN 1751-5254. - Vol. 1.2007, 4, p. 391-413
|
Publisher: |
Inderscience Enterprises Ltd |
Subject: | bi-criteria scheduling | cellular manufacturing | manufacturing cells | sequence-dependent setups | setup times | flowshop scheduling | pareto-optimal frontier | multi-objective genetic algorithms | MOGA | makespan | total flow time | lower bound | branch and bound | B&B | metaheuristics |
-
Bi-criteria scheduling of a flowshop manufacturing cell with sequence dependent setup times
Hendizadeh, S. Hamed, (2007)
-
Efficient upper and lower bounding methods for flowshop sequence-dependent group scheduling problems
Keshavarz, Taha, (2014)
-
Iterated greedy algorithms for a complex parallel machine scheduling problem
Mecler, Davi, (2022)
- More ...
-
Bi-criteria scheduling of a flowshop manufacturing cell with sequence dependent setup times
Hendizadeh, S. Hamed, (2007)
-
Bi-criteria scheduling of a flowshop manufacturing cell with sequence dependent setup times
Hendizadeh, S. Hamed, (2007)
-
Bi-criteria scheduling of a flowshop manufacturing cell with sequence dependent setup times
Hendizadeh, S. Hamed, (2007)
- More ...