Bi-criterion single-machine scheduling and due-window assignment with common flow allowances and resource-dependent processing times
Year of publication: |
September 2016
|
---|---|
Authors: | Yin, Yunqiang ; Wang, Du-Juan ; Cheng, TC. E. ; Wu, Chin-Chia |
Published in: |
Journal of the Operational Research Society : OR. - Basingstoke, Hampshire : Palgrave, ISSN 0030-3623, ZDB-ID 716033-1. - Vol. 67.2016, 9, p. 1169-1183
|
Subject: | scheduling | due-window assignment | controllable processing times | resource allocation | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Allokation | Allocation | Produktionssteuerung | Production control | Durchlaufzeit | Lead time |
-
Scheduling controllable processing time jobs in seru production system with resource allocation
Jiang, Yujing, (2022)
-
Yin, Yunqiang, (2014)
-
Single-machine batch scheduling problem with job rejection and resource dependent processing times
Huang, Weifan, (2018)
- More ...
-
Just-in-time scheduling with two competing agents on unrelated parallel machines
Yin, Yunqiang, (2016)
-
Due date assignment and scheduling on a single machine with two competing agents
Wang, Du-Juan, (2016)
-
Two-agent flowshop scheduling to maximize the weighted number of just-in-time jobs
Yin, Yunqiang, (2017)
- More ...