Bi-objective parallel machine scheduling with additional resources during setups
Year of publication: |
2021
|
---|---|
Authors: | Yepes-Borrero, Juan C. ; Perea, Federico ; Ruiz, Rubén ; Villa, Fulgencia |
Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 292.2021, 2 (16.7.), p. 443-455
|
Subject: | Multicriteria optimization | Parallel machine | Resources | Scheduling | Sequence dependent setup times | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Algorithmus | Algorithm | Multikriterielle Entscheidungsanalyse | Multi-criteria analysis | Durchlaufzeit | Lead time | Produktionssteuerung | Production control |
-
Fanjul-Peyro, Luis, (2019)
-
Lopez-Esteve, Axel, (2023)
-
Scheduling to minimize the maximum total completion time per machine
Wan, Long, (2015)
- More ...
-
Flowshop with additional resources during setups : mathematical models and a GRASP algorithm
Yepes-Borrero, Juan C., (2023)
-
Lopez-Esteve, Axel, (2023)
-
Perea, Federico, (2023)
- More ...