Bi-objective partial flexible job shop scheduling problem : NSGA-II, NRGA, MOGA and PAES approaches
Year of publication: |
2012
|
---|---|
Authors: | Rabiee, M. ; Zandieh, M. ; Ramezani, P. |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 50.2012, 24 (15.12.), p. 7327-7342
|
Subject: | bi-objective optimisation | MOGA | NRGA | NSGA-II | PAES | partial flexible job shop. | Scheduling-Verfahren | Scheduling problem | Produktionssteuerung | Production control | Evolutionärer Algorithmus | Evolutionary algorithm | Flexibles Fertigungssystem | Flexible manufacturing system |
-
Study on multi-objective flexible job-shop scheduling problem considering energy consumption
Jiang, Zengqiang, (2014)
-
A memetic algorithm for multi-objective flexible job-shop problem with worker flexibility
Gong, Xuran, (2018)
-
Han, Libin, (2014)
- More ...
-
Bi-objective partial flexible job shop scheduling problem: NSGA-II, NRGA, MOGA and PAES approaches
Rabiee, M., (2012)
-
Rabiee, M., (2012)
-
Rabiee, M., (2012)
- More ...