Bicriteria scheduling on a series-batching machine to minimize maximum cost and makespan
| Year of publication: |
2013
|
|---|---|
| Authors: | He, Cheng ; Lin, Hao ; Tian, Ji |
| Published in: |
Central European journal of operations research : CEJOR ; official journal of the Austrian, Croatian, Czech, Hungarian, Slovakian and Slovenian OR Societies. - Berlin : Springer, ISSN 1435-246X, ZDB-ID 1178875-6. - Vol. 21.2013, 1, p. 177-186
|
| Subject: | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Theorie | Theory |
-
Thürer, Matthias, (2013)
-
Smoothed analysis of the 𝜅-swap neighborhood for makespan scheduling
Rohwedder, Lars, (2025)
-
Yaghtin, Mohammad, (2025)
- More ...
-
He, Cheng, (2016)
-
Serial-batching scheduling with two agents to minimize makespan and maximum cost
He, Cheng, (2020)
-
Bicriteria scheduling for due date assignment with total weighted tardiness
Lin, Hao, (2018)
- More ...