BIM-based time-cost optimization of a large-span spatial steel structure in an airport terminal building
| Year of publication: |
2021
|
|---|---|
| Authors: | Yu, Jingyu ; Wang, Jingfeng ; Hua, Zhengmao ; Wang, Xingxing |
| Published in: |
Journal of Facilities Management. - Emerald Publishing Limited, ISSN 1472-5967, ZDB-ID 2119497-X. - Vol. 20.2021, 3, p. 469-484
|
| Publisher: |
Emerald Publishing Limited |
| Subject: | Case study | BIM | Time-cost optimization | Large-span spatial steel structure |
-
Genetic algorithm for project time-cost optimization in fuzzy environment
Haque, Khan Md. Ariful, (2012)
-
Genetic algorithm for project time-cost optimization in fuzzy environment
Haque, Khan Md. Ariful, (2012)
-
BIM-enabled facilities management (FM): a scrutiny of risks resulting from cyber attacks
Ghadiminia, Nikdokht, (2021)
- More ...
-
Qiu, Zhigang, (2022)
-
Value methodology in public engagement for construction development projects
Leung, Mei-Yung, (2014)
-
Yu, Jingyu, (2015)
- More ...