Combined quay crane assignment and quay crane scheduling with crane inter-vessel movement and non-interference constraints
Year of publication: |
2018
|
---|---|
Authors: | Alsoufi, Ghazwan ; Yang, Xinan ; Salhi, Abdellah |
Published in: |
Journal of the Operational Research Society. - London : Taylor and Francis, ISSN 1476-9360, ZDB-ID 2007775-0. - Vol. 69.2018, 3, p. 372-383
|
Subject: | Container terminals | quay crane assignment | quay crane scheduling | branch-and-cut | genetic algorithm | Scheduling-Verfahren | Scheduling problem | Hafenanlagen | Port facilities | Kran | Crane | Mathematische Optimierung | Mathematical programming | USA | United States | Containerterminal | Container terminal | Evolutionärer Algorithmus | Evolutionary algorithm |
-
Integrated berth allocation and quay crane assignment with maintenance activities
Zheng, Feifeng, (2019)
-
Li, Feng, (2015)
-
An exact algorithm for the integrated planning of berth allocation and quay crane assignment
Vacca, Ilaria, (2013)
- More ...
-
Salhi, Abdellah, (2019)
-
Combined strip and discharge delivery of containers in heterogeneous fleets with time windows
Yang, Xinan, (2021)
-
System reliability-redundancy allocation by the multiobjective plant propagation algorithm
Mellal, Mohamed Arezki, (2021)
- More ...