Crane scheduling problem with non-interference constraints in a steel coil distribution centre
| Year of publication: |
1-15 March 2017
|
|---|---|
| Authors: | Maschietto, Gabriela N. ; Ouazene, Yassine ; Ravetti, Martín Gómez ; Souza, Maurício C. de ; Yalaoui, Farouk |
| Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 55.2017, 5/6 (1/15.3.), p. 1607-1622
|
| Subject: | scheduling | mathematical programming | genetic algorithms | warehousing systems | non-interference constraints | Scheduling-Verfahren | Scheduling problem | Mathematische Optimierung | Mathematical programming | Evolutionärer Algorithmus | Evolutionary algorithm | Theorie | Theory | Heuristik | Heuristics |
-
An adaptive penalty guided genetic algorithm for scheduling parallel batch processing machines
Xu, Shubin, (2018)
-
Lin, Lin, (2018)
-
Research trends in combinatorial optimization
Weinand, Jann Michael, (2022)
- More ...
-
Flowshop scheduling problem with parallel semi-lines and final synchronization operation
Guimarães, Irce F. G., (2019)
-
Mateus, Geraldo R., (2010)
-
Pantuza, Guido <Jr.>, (2022)
- More ...