Decentralised collaborative job reassignments in additive manufacturing
-
Achillas, Charisios, (2017)
-
Multitask scheduling on cloud additive manufacturing using NSGA-II
Sugarindra, Muchamad, (2024)
-
Wang, Tianri, (2022)
- More ...
-
Location and capacity allocation for emergency contact points in large-scale power outages
Truden, Christian, (2025)
-
The collaborative batching problem in multi-site additive manufacturing
Zehetner, Dominik, (2022)
-
Simulation-based optimization methods for setting production planning parameters
Gansterer, Margaretha, (2014)
- More ...