Design Study and Cost Estimate for an Assurred Isolation Facility in Texas
Year of publication: |
2009-08-27
|
---|---|
Authors: | Baird, R. D. ; Rogers, B. C. ; Chau, N. ; Kerr, Thomas A |
Subject: | general and miscellaneous//mathematics, computing, and information science | ANNUAL VARIATIONS | CONCRETES | CONTAINERS | DESIGN | LIFE CYCLE | LIFE-CYCLE COST | LIFETIME | MAINTENANCE | MANAGEMENT | WASTES |
-
Financing Strategies for Nuclear Fuel Cycle Facility
David Shropshire, (2009)
-
An expandable software model for collaborative decision making during the whole building life cycle
Papamichael, K., (2008)
-
Visual Sample Plan (VSP): A Tool for Balancing Sampling Requirements Against Decision Error Risk
Pulsipher, Brent A., (2008)
- More ...
-
Falls and working individuals: role of extrinsic and intrinsic factors
Gauchard, G.N., (2001)
-
Evolution of water governance in Bangladesh : an urban perspective
Yasmin, Tahmina, (2018)
-
The KONVERGENCE Model for Sustainable Decisions
Kerr, Thomas A, (2009)
- More ...