Discrete time model and algorithms for container yard crane scheduling
Year of publication: |
2009
|
---|---|
Authors: | Li, Wenkai ; Wu, Yong ; Petering, M. E. H. ; Goh, Mark ; Souza, Robert de |
Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 198.2009, 1 (1.10.), p. 165-172
|
Subject: | Scheduling-Verfahren | Scheduling problem | Containerterminal | Container terminal | Kran | Crane | Algorithmus | Algorithm | Containerverkehr | Container transport |
-
Hoseini, Seyed Farzad, (2018)
-
Integrated simulation and optimisation of scheduling yard crane and yard truck in loading operation
Cao, Pengliang, (2020)
-
Ding, Yi, (2023)
- More ...
-
A continuous time model for multiple yard crane scheduling with last minute job arrivals
Li, Wenkai, (2012)
-
Petering, Matthew E. H., (2009)
-
Scheduling multiple yard cranes with crane interference and safety distance requirement
Wu, Yong, (2015)
- More ...