Drum-buffer-rope and workload control in high-variety flow and job shops with bottlenecks : an assessment by simulation
| Year of publication: |
June 2017
|
|---|---|
| Authors: | Thürer, Matthias ; Stevenson, Mark A. ; Silva, Cristovao ; Qu, Ting |
| Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 188.2017, p. 116-127
|
| Subject: | Drum-buffer-rope | Workload control | Order release | Bottleneck | Theory of constraints | Engpass | Simulation | Produktionssteuerung | Production control | Theorie | Theory | Scheduling-Verfahren | Scheduling problem | Produktionsplanung | Production planning |
-
Workload control in unbalanced job shops
Fernandes, Nuno O., (2014)
-
Thürer, Matthias, (2022)
-
Rule based workload control in semiconductor manufacturing revisited
Neuner, Philipp, (2021)
- More ...
-
Job sequencing and selection within workload control order release : an assessment by simulation
Thürer, Matthias, (2016)
-
Thürer, Matthias, (2019)
-
Thürer, Matthias, (2017)
- More ...