Drum buffer rope-based heuristic for multi-level rolling horizon planning in mixed model production
Year of publication: |
2019
|
---|---|
Authors: | Ullah, Saif ; Guan, Zailin ; Wang, Chuangjian ; He, Cong ; Yue, Lei ; Mirza, Jahanzaib |
Subject: | drum buffer rope | heuristic | mixed model | production planning | scheduling | shifting bottleneck | Heuristik | Heuristics | Produktionsplanung | Production planning | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Engpass | Bottleneck | Produktionssteuerung | Production control |
-