Dual-resource flexible job shop scheduling considering worker proficiency differences
| Year of publication: |
2025
|
|---|---|
| Authors: | Wang, Chuang ; Fan, Di ; Liu, Yang ; Ren, Shan ; Wang, Jin |
| Published in: |
Computers & operations research : an international journal. - Amsterdam [u.a.] : Elsevier, ISSN 0305-0548, ZDB-ID 1499736-8. - Vol. 184.2025, Art.-No. 107216, p. 1-15
|
| Subject: | Dual resource constrained flexible job-shop problem | Human factors | Migratory bird optimization | Preparation time | Workers’ proficiency | Scheduling-Verfahren | Scheduling problem | Flexibles Fertigungssystem | Flexible manufacturing system | Produktionssteuerung | Production control |
-
A hybrid artificial bee colony algorithm for flexible job shop scheduling with worker flexibility
Gong, Guiliang, (2020)
-
A memetic algorithm for multi-objective flexible job-shop problem with worker flexibility
Gong, Xuran, (2018)
-
Simulation analysis of multi-node manufacturing system under design and scheduling strategies
Kumar, Rajeev, (2019)
- More ...
-
Knowledge-driven digital twin manufacturing cell towards intelligent manufacturing
Zhou, Guanghui, (2020)
-
A distributed autonomous organization for internet address management
Angieri, Stefano, (2020)
-
Frontline employees' compliance with fuzzy requests : a request-appraisal-behavior perspective
Li, Xiaodong, (2021)
- More ...