Dynamic shop-floor scheduling using real-time information : a case study from the thermoplastic industry
Year of publication: |
2023
|
---|---|
Authors: | Ghaleb, Mageed ; Taghipour, Sharareh |
Published in: |
Computers & operations research : and their applications to problems of world concern ; an international journal. - Oxford [u.a.] : Elsevier, ISSN 0305-0548, ZDB-ID 194012-0. - Vol. 152.2023, p. 1-29
|
Subject: | Dynamic scheduling | Parallel machines scheduling | Predictive-reactive scheduling | Real-time information | Simulated annealing | Industry 4.9 | Scheduling-Verfahren | Scheduling problem | Theorie | Theory |
-
An improved imperialist competitive algorithm based photolithography machines scheduling
Zhang, Peng, (2018)
-
Robust allocation of operating rooms : a cutting plane approach to handle lognormal case durations
Sagnol, Guillaume, (2018)
-
Belkaid, Fayçal, (2016)
- More ...
-
Evidence-based study of the impacts of maintenance practices on asset sustainability
Ghaleb, Mageed, (2023)
-
Ghaleb, Mageed, (2020)
-
Rajabian, Amir, (2021)
- More ...