Energy-oriented bi-objective optimisation for a multi-module reconfigurable manufacturing system
Year of publication: |
2019
|
---|---|
Authors: | Liu, Ming ; An, Lijie ; Zhang, Jiantong ; Chu, Feng ; Chu, Chengbin |
Subject: | bi-objective optimisation | energy consumption | multi-module | multi-product | reconfigurable manufacturing system | Produktionssystem | Manufacturing system | Energiekonsum | Energy consumption | Evolutionärer Algorithmus | Evolutionary algorithm | Mathematische Optimierung | Mathematical programming | Scheduling-Verfahren | Scheduling problem | Simulation |
-
Optimisation of berth and quay crane joint scheduling considering efficiency and energy consumption
Wen, Dusu, (2023)
-
Diaz, Juan Esteban, (2018)
-
Kazemisaboor, Amirhossein, (2022)
- More ...
-
Energy-oriented bi-objective optimization for the tempered glass scheduling
Liu, Ming, (2019)
-
An FPTAS for uniform machine scheduling to minimize makespan with linear deterioration
Liu, Ming, (2012)
-
Scheduling a tempered glass manufacturing system : a three-stage hybrid flow shop model
Liu, Ming, (2017)
- More ...