Flexible job shop scheduling with lot streaming and sublot size optimisation
Year of publication: |
1-15 October 2018
|
---|---|
Authors: | Bożek, Andrzej ; Werner, Frank |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 56.2018, 19 (1/15.10.), p. 6391-6411
|
Subject: | flexible job shop | lot streaming | lot sizing | mixed-integer linear programming | tabu search | constraint programming | Losgröße | Lot size | Scheduling-Verfahren | Scheduling problem | Mathematische Optimierung | Mathematical programming | Produktionssteuerung | Production control | Theorie | Theory |
-
Lot streaming with flexible process plans
Yavuz, Yasemin, (2013)
-
A review of lot streaming in a flow shop environment with makespan criteria
Gómez-Gasquet, Pedro, (2013)
-
Rohaninejad, Mohammad, (2023)
- More ...
-
Keller, Berndt, (2008)
-
Mathematics of economics and business
Werner, Frank, (2006)
-
Rüter, Sebastian, (2016)
- More ...